Guild Master Errata

Page old text / image new text / image
15 4. Hire additional Builders as needed by repeating steps 1 & 2. 4. Hire additional Builders as needed by repeating steps 2 & 3.
19 Completing an attempt contract order - point 3 uses the bonus icon Completing an attempt contract order - point 3 should use the boon icon
19 (Point 4) Replace the Contract by drawing... Replace the Contract (if it was on the board) by drawing...
19 At the end of point 4 add sentence: Completed Private Contracts are not replaced in this way.
21 " If so, you may attempt that Private Contract following the normal rules for resolving an Attempt Contract Order (See page 18)." "If so, you may attempt that Private Contract following the
normal rules for resolving an Attempt Contract Order (See page 18), but without replacing the Private Contract if it is completed."
9 column 2 - Re-roll: You may re-roll any 2 dice, or any dice twice, after you roll a Skill Check of the type indicated. Re-roll: You may re-roll up to 2 dice, or 1 dice up to twice, after you roll a Skill Check of the type indicated.
Screen panel 1 Re-roll up to 2 dice, or 1 dice twice Re-roll up to 2 dice, or 1 dice up to twice

 

You can download this errata as a PDF from the Guild Master page. Included in that document are pages that you can print onto self-adhesive paper to sticker your original game.

Leave a reply